China Cheap price Alkaline Battery Aa - DG Sunmo 1.5V LR03 AM4 Alkaline AAA Battery – Sunmol
China Cheap price Alkaline Battery Aa - DG Sunmo 1.5V LR03 AM4 Alkaline AAA Battery – Sunmol Detail:
Introduction
Scope
This specification provides the technical requirements of alkaline manganese dioxide battery(LR03).The requirements and size should satisfy or above GB/T8897.1 and GB /T8897.2 if there is no any other detail requirements.
1.1Reference Standards
GB/T8897.1 (IEC60086-1, MOD)(Primary Battery Part 1: General)
GB/T8897.2 (IEC60086-2, MOD)(Primary Battery Part2: Size and Technical requirements)
GB8897.5 (IEC 60086-5, MOD)(Primary Battery Part5: Safety of batteries with aqueous electrolyte)
1.2Environmental Protection Standard
The battery meets the standard of EU battery directives 2006/66/EC.
Chemical system, Voltage and Designation
Chemical system: Zn-MnO2(KOH), without Hg & Cr
Nominal Voltage: 1.5V
Designation: IEC: LR03 ANSI: AAA JIS: AM-4 Others: 4003,E92
Operating Temp Range Spec of -20℃ to +60℃
Battery Size
Battery meets the picture standard
3.1 Inspection Tool
Using vernier calipers which precision is up 0.02mm. to avoid short-circuit, should paste on one insulation material on one end of the vernier calipers.
3.2 Acceptance Method
Using GB2828.1-2003 sampling program, special sampling S-3, acceptance quality limitation: AQL=1.0
Product Features
Weight and discharging capacity
Battery weight about: 10.5g
Discharging capacity: 1000mAh(Loading75Ω, 4h/day, 20±2℃ RH60±15%, End-point Voltage0.9V)
Open circuit voltage, loading voltage and short-circuit current
Project |
Open circuit Voltage(V) |
Loading Voltage(V) |
Short-circuit Voltage(A) |
Sampling Voltage |
In 2 months New battery |
1.59 |
1.40 |
5.00 |
GB2828.1-2003 One Sampling, special sampling S-4,AQL=1.0 |
12 months storage in room temperature |
1.56 |
1.35 |
4.00 |
|
Inspection Condition |
Loading 3.9Ω, loading time 0.3s,temp:20±2℃ |
Technical Requirements
Discharging Ability
Discharging Temp:20±2℃ |
|||||
Condition |
GB/T8897.2 Requirements |
Shortest Average Discharging Time |
|||
Load |
Discharging Way |
End-point Voltage |
|
2 months new battery |
12 months storage battery |
10Ω |
1h/d |
0.9 V |
6h |
7.5h |
6.8h |
75Ω |
4h/d |
0.9 V |
50h |
60h |
55h |
5.1Ω |
4min/h,8h/d |
0.9 V |
145min |
160min |
145min |
24Ω |
15s/min,8h/d |
1.0 V |
14.5h |
18h |
16h |
20Ω |
24h/d |
0.9 V |
/ |
15h |
13.5h |
3.9Ω |
24h/d |
0.9 V |
/ |
135min |
110min |
Accordance of shortest discharging time
1. Testing 9 batteries of each discharging way
2. The result of the average discharging time from each discharging standard shall be equal to or more than the average minimum time requirement; no more than one battery has a service output less than 80% of the specified requirement
3. The result of the average discharging time from each discharging standard shall be equal to or more than the average minimum time requirement, if one battery has a service output less than 80% of the specified requirement then take another 9 pieces to test again. This lot of batteries are qualified if the result meets the NO.2 provision. If not qualified then will not test again.
Packaging and Marking
Anti-leakage ability
Project |
Condition |
Requirements |
Qualified Standard |
Over Discharging |
Continuous discharging 48h in 20±2℃, huminity60±15%, load 10Ω condition. |
No leakage by visual inspection |
N=9 Ac=0 Re=1 |
High-temp storage |
Storing in 60±2℃, relative humidity 90% condition for 20 days. |
|
N=30 Ac=1 Re=2 |
Safety Requirements
Project |
Condition |
Requirements |
Qualified Standard |
External Short-circuit |
Using wire to connect positive and negative pole in 20±2℃ for 24h. |
No Explosion |
N=5 Ac=0 Re=1 |
Improper Equipment |
4 batteries in series connection, one of them is in reverse connection. |
Leakage happened on the reversed battery or the shell temp reduce to room temp |
N=4×5 Ac=0 Re=1 |
Cautions
Signs
The following signs are on the battery body
1. Model: LR03/AAA
2. Manufacturer and brand: Sunmol ®
3. Battery Poles:”+”and”-”
4. Expiry date or manufacturing date
5. Warnings.
Cautions for using
1. This battery can’t be charged, leakage and explosion may happen when charging.
2. Make sure the battery is in correct position as + and -.
3. Short-circuit, heating, disposing of into fire or disassembling of battery is prohibited.
4. Battery can not be forced discharged, which leads to excess gassing and may result in bulging, leakage and de-crimping of cap.
5. New batteries and used ones can not be used at the same time. It is recommended to use the same brand when replacing batteries.
6. The battery should be taken out from the device which will not be used for a long time.
7. Exhausted battery should be taken out from the device.
8. Welding batteries are prohibited or it will cause damage.
9. The batteries should be kept from children, if swallowed, contact a doctor immediately.
Reference Standards
Normal Package
Each 2, 3 or 4 batteries in a shrink package, 60 pieces in one inner box, 12 boxes in one carton.
Storage and Expiry
1. Batteries should be put in cool, dry and with air-flowing places
2. The batteries should not be exposed in sunshine or in raining places.
3. Do not mix the batteries which without labels
4. Storing in 20℃±2℃, 60%±15%RH condition. The storage time is 3 years.
Discharge curve
Nominal discharging curve
Discharging condition: 20℃±2℃, RH60±15%
With the progress of product technology, technical parameters, the specification will be updated too, please contact Anyida for latest specification.
FAQ
Q1. Could you do customer brand?
A:Of course ,we could provide professional OEM service.
Q2. What is your terms of packing?
A: Generally, we pack our batteries in carton .If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We’ll show you the photos of the products and packages before you pay the balance, OR LC at sight , DP
Q4. What is your terms of delivery?
A: EXW, FOB, CIF,CNF
Q5. How about your battery delivery time?
A: Within 35 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q6. What is your mini rechargeable battery sample policy?
A: We can supply the free mini rechargeable battery sample battery, but the customers have to pay the courier cost.
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Q8.Is this product safe?
A: Anti short circuit & Anti scald, Anti explosion,Environmental friendly.
Q9.What’s the MOQ?
A:Small quantity is OK for trial order or samples if we have stock,customize brand or customize request please contact us.
Q10:what is advantage of being our sunmol sole agents ?
A:We are not only offer the disocudn prices and reliable quality product but also we can offer free a set of gift for you to promoted our brand . once your reache our goals and we can refund comission or send free goods to support your selling.
Product detail pictures:
Related Product Guide:
Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" as well as the theory of "quality the basic, believe in the 1st and management the advanced" for China Cheap price Alkaline Battery Aa - DG Sunmo 1.5V LR03 AM4 Alkaline AAA Battery – Sunmol , The product will supply to all over the world, such as: Czech Republic, Hungary, Indonesia, Over the years, with high-quality solutions, first- class service, ultra-low prices we win thee trust and favor of customers. Nowadays our products sell all over the domestic and abroad. Thanks for the regular and new customers support. We offer high quality product and competitive price, welcome the regular and new customers cooperate with us!
By Nora from Jamaica - 2017.02.14 13:19
The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
By Chloe from Washington - 2017.04.08 14:55